This PennDOT project consisted of the replacement of the existing arch culvert carrying SR 2040 (E. Main St) over Redstone Creek with a precast concrete arch culvert, Redstone Creek realignment, creation of a floodplain, demolition of buildings, constructing a temporary runaround with a temporary bridge, and other miscellaneous roadway construction.